BMS and the BACS decree.
Building management system.
Supervision, scheduling, alarms and energy monitoring: your equipment under control, and support with the BACS decree and the tertiary decree, day to day in the Alpes-Maritimes, the Var and Monaco. Based in Nice, we also work on large projects across France.

Controlling and monitoring your equipment.
A BMS, from sensors to screen
- EquipmentBoiler room, refrigeration unit and air handling unit report their status and receive their operating commands.
- Sensors and metersSensors measure the temperature of the rooms; meters record the energy used.
- Supervision busSensors and equipment send their readings and alarms to the BMS controller, along dedicated cable trays.
- BMS cabinetThe controller and its input and output modules: it reads the sensors, controls the equipment and raises the alarms.
- Supervision and alarmsHeating, air conditioning and ventilation monitored, with an alarm when a piece of equipment moves out of normal operation.
- SchedulingSchedules, set points and operating modes set according to how your premises are occupied.
- Energy monitoringEnergy use recorded to spot drifts and track your targets. We also maintain the BMS in our HVAC maintenance contracts.
- Readings, alarms and commands
- Alarm or drift
In a server room, the BMS also tracks the temperature and humidity of the racks: see our data centers and server rooms page.
What the rules say.
BACS decree
- > 290 kWBMS mandatory since 1 January 2025
A building management system is mandatory in tertiary-sector buildings whose heating or cooling exceeds 290 kW (deadline of 1 January 2025).
- > 70 kWFrom construction, otherwise by 1 January 2030 at the latest
Above 70 kW, a building management system is mandatory from construction in new buildings, and in other buildings when the system is renewed and by 1 January 2030 at the latest.
- 10 yearsPayback period, the exemption threshold
The owner is exempt from this obligation if they produce a study establishing that the installation is not feasible with a payback period of less than ten years.
Source: article R175-2 of the French construction and housing code (decree no. 2025-1343 of 26 December 2025).
Tertiary decree
- 1,000 m²Floor area from which the decree applies
Existing tertiary-sector buildings, parts of buildings or groups of buildings with at least 1,000 m² of floor area must reach, in 2030, 2040 and 2050, either a final energy consumption reduced by 40%, 50% and 60% compared with a reference year no earlier than 2010, or a consumption level set in absolute terms, based on that of new buildings in their category.
- 2030 · 2040 · 2050Three deadlines, adjustable targets
These targets can be adjusted for technical, architectural or heritage constraints, a change in the activity or its volume, or manifestly disproportionate costs.
Sources: articles L174-1 and R174-22 of the French Construction and Housing Code.
Texts checked on Légifrance on 27 October 2026. Whether your building is concerned depends on its floor areas and outputs: we help you gather this information, without ruling in place of the texts.
The whole site, supervised in 3D.
In the 3D diagram of our business section, sensors, refrigeration units, air handling unit, VRV and inverters report to the BMS cabinet, then to the supervision screen in the maintenance room.
Your questions about BMS
Discuss your project →Do you maintain the BMS?
Yes, in our HVAC maintenance contracts. The Premium plan includes one visit per quarter, with a review of alarms and drifts and a check of the controls or the BMS.
Is a building management system mandatory in our building?
A building management system is mandatory in tertiary-sector buildings whose heating or cooling exceeds 290 kW (deadline of 1 January 2025).
Above 70 kW, a building management system is mandatory from construction in new buildings, and in other buildings when the system is renewed and by 1 January 2030 at the latest.
The owner is exempt from this obligation if they produce a study establishing that the installation is not feasible with a payback period of less than ten years.
Source: article R175-2 of the French construction and housing code (decree no. 2025-1343 of 26 December 2025).
Whether your building is affected depends on its use, the power of its heating or cooling systems and the date of its building permit: we help you gather this information, without ruling in place of the regulations.
What does a building management system do?
Supervision, scheduling, alarms and energy monitoring: your equipment under control.
Heating, air conditioning and ventilation monitored, with an alarm when a piece of equipment moves out of normal operation.
Schedules, set points and operating modes set according to how your premises are occupied.
Consumption readings to spot drifts and track your targets.
A project
or a breakdown?
A few details are enough and we will call you back; the online configurator (optional) lets you detail your project.
Your premises,
our advice.
Describe your business and your equipment: we will offer a visit and a proposal suited to your sector and your size.